In 1935, the construction of the Port Bloc dock began alongside the commissioning of the ferry Le Cordouan, which included an esplanade featuring parking, benches, and tree plantings for passenger comfort. A waiting area or station was also established. However, following severe bombings in April 1945 that damaged the Port Bloc facilities, the Pointe de Grave subdivision of the Bordeaux Autonomous Port proposed the reconstruction of the ferry terminal in November 1954. The reconstruction work started in January 1957, initially by L. Sabatie of Pessac, but was completed by local firms after the contract was terminated on May 15, 1957.