Usine hydroélectrique des Claux

Industrial · by Planche Gilbert · 1929

Vallouise-Pelvoux, France

Constructed between 1929 and 1935, the hydroelectric plant at Claux was operated by the Société d’énergie électrique du Briançonnais, situated in a valley at the end of the Claux hamlet. It harnesses water from the Écrins massif and includes a supply system with valves and pipelines, an operational building, and an electricity distribution network that served local facilities, including the Bois de l'Ours sanatorium in Briançon. This plant represents the first generation of hydroelectric installations aimed at fostering the development of mountain valleys, where engineers and architects sought to elevate the projects beyond mere technical functionality.

Nearby architecture

Link copied ✨
💬 Comments 0
No comments yet.
Write a comment
Reading is public. Writing is for members only (login required).
ArchitectureMapper